Experience
Company: WorleyParsons Duration: 08/2011 to 05/2014
Position: Project Procurement Expeiting Mgr Duration: 08/2011 to 05/2014 Description:
Red Leaf Resources, Seep Ridge EPS, UT ($180mil) Led a team of procurement experts in various specialties assigned to ensure delivery of materials, supplies, equipment and services to meet project requirements within budget and on schedule. Liaised with the Project Manager and was the primary procurement interface between the Client, the project and the supplier / contractor community. Responsible for securing the worldwide best value in contracts and procurements throughout the life cycle of the project. Provide contract, procurement, and logistics services to Red Leaf Resources for all materials, equipment, facilities and services required for the successful execution of the project, including maximizing local content. Manage the expediting, inspection, delivery and monitor receipt of all materials and equipment to meet project schedules and thus contribute directly to the successful execution of the project. Ensure best value in contracting and procurements through use of Worley Parsons EMS and WPMP processes. Software SPM. Procurement / Expediting Manager, WorleyParsons, Azusa, CA ExxonMobil, Point Thomson Project, AK. ($1.8bil) Developed and managed all Expediting activities. Produced and maintained project expediting standards and procedures. Coordinated, developed and recruited expediting professionals. Developed strategic relationships with key suppliers. Set clear direction and expectations for the Expediting team members to ensure customer’s needs are fully satisfied. Conducted performance appraisals. Counseled and assist staff on policy, codes of conduct and procedures. Implemented and Monitored continuous Improvement to the Systems and Processes within project expediting. Chaired Expediting meetings with Client and Project Management. Conducted supplier Pre-Qualifications with Engineering, QA and SSHE. Software SPM.

Company: Marathon Petroleum Duration: 02/2018 to 09/2019
Position: Project Procurement Specialist Duration: 02/2018 to 09/2019 Description:
Perform site procurement activities in support of projects including, as appropriate, qualifying new suppliers, generating procurement bid packages, analyzing bids, negotiating pricing/terms, making recommendations and issuing purchase orders (including blanket orders); and appropriate utilization of Tesoro ERP and other systems. Developed a materials receiving and issuing program in preparation of materials to be received at site 2018/2019 and manage aspects of receiving as needed. Software used, SAP, Ariba and INS Networld.

Company: Bechtel Duration: 02/2016 to 01/2018
Position: Materials Lead Duration: 02/2016 to 01/2018 Description:
Pueblo Chemical Agent Destruction Pilot Plant ($2bil) Served as team lead for materials coordination department. Served as liaison at the project site between Project Procurement for reporting of undelivered materials, stored materials, and personnel for accurate reporting of materials required for work package installation. Coordinate with responsible groups that materials provided in a timely manner and in sufficient quantity to support sustained operations. Implemented planned inventory control mechanisms, assisted in early identification of surplus or unneeded materials, and coordinated material availability in support of operations and design revisions or rework. Software used BPS and Maximo.

Company: Tesoro Duration: 02/2015 to 07/2015
Position: Piping Materials Coodinator Duration: 02/2015 to 07/2015 Description:
Salt Lake City Refinery FGR Project / Turnaround 2015 Materials Management includes detailed identification of the Materials and equipment based on the overall Project Plan, their storage, maintenance and issuing. This includes supply analysis, market research assessment, sourcing strategies, identification of project-critical materials and equipment. Additionally, includes mitigation measures for OS&D’s and materials overlooked.
Education
University: Saddleback Degree: none Graduation Year: None Area: Bus. Law/ Mgt Start - End Year: 1983 - 1985
University: Rio Hondo Degree: None Graduation Year: None Area: Process Piping Design, Mech. Drawing, Arch. Drawing Start - End Year: 1975 - 1977

Work History & Review

No Work History & Review yet!