• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


Elhadi Abusin
Website
  

Elhadi Abusin

Last Seen 2 months ago

!

About Elhadi Abusin

Cairo, Cairo, Egypt 12:25 am local time

Consultant Petrophysicist
Results-driven professional with extensive experience managing petrophysical evaluation and expediting field development, exploration, appraisal, and reservoir studies. Well-versed in planning open/cased-hole petrophysical data acquisition for wireline and logging while drilling (LWD) as well as building and maintaining petrophysical database. Expert in multi-mineral petrophysical interpretation and modelling, saturation monitoring, reservoir characterization, formation evaluation of carbonate/clastic reservoirs, reservoir rock typing, and porosity permeability examination. Demonstrated ability to conduct conventional/specialized core analysis and interpret LWD data and cased-hole logs. Excellent communicator with proven capability of building strong relationships across multi-disciplinary functions, stakeholders, and senior management.



Experience
Company: Petroleum Laboratories Analyses Services, Research & Studies PLRS Duration: Jan 01, 2021 to Sep 01, 2021 . 8 months Description:
Facilitate Abu Gabra FDP study via evaluation while managing QA/QC activities and log editing/normalization. Deliver petrophysical model involving core, mudlog, DST, MDT and PLT. Evaluate log/core data and calibrate log data to core. Formulate rock typing scheme and saturation height profile via integration of log/core data, including CCAL and SCAL.
Position: Consultant Petrophysicist Duration: Jan 01, 2021 to Sep 01, 2021 . 8 months Description:
Facilitate Abu Gabra FDP study via evaluation while managing QA/QC activities and log editing/normalization. Deliver petrophysical model involving core, mudlog, DST, MDT and PLT. Evaluate log/core data and calibrate log data to core. Formulate rock typing scheme and saturation height profile via integration of log/core data, including CCAL and SCAL.

Company: Qatar Petroleum Duration: Aug 01, 2012 to Jun 01, 2020 . 7 years 10 months Description:
Improved data acquisition process by developing/rationalizing standard procedures while monitoring fluid contact and managing reservoir plans. Expedited studies and field development planning by implementing petrophysical and geological data. Provided petrophysical input to well prognosis as well as end of well reports. Initiated petrophysical evaluation using Geoframe, Techlog and IP as well as analyzed and assessed tight gas reservoir. Ensured full compliance with standard operating procedures while executing MDT pressure and sampling points selections
Position: Petrophysicist Duration: Aug 01, 2012 to Jun 01, 2020 . 7 years 10 months Description:
Improved data acquisition process by developing/rationalizing standard procedures while monitoring fluid contact and managing reservoir plans. Expedited studies and field development planning by implementing petrophysical and geological data. Provided petrophysical input to well prognosis as well as end of well reports. Initiated petrophysical evaluation using Geoframe, Techlog and IP as well as analyzed and assessed tight gas reservoir. Ensured full compliance with standard operating procedures while executing MDT pressure and sampling points selections

Company: Schlumberger Duration: Oct 01, 2006 to Aug 01, 2012 . 5 years 10 months Description:
Analyzed logging relating to drilling data and evaluated open/cased-hole logs while stewarding log data acquisition and processing as well as monitored the team throughout log operations. Initiated elemental capture spectroscopy and NMR processing/interpretation.
Position: Petrophysicist Team Lead Duration: Oct 01, 2006 to Aug 01, 2012 . 5 years 10 months Description:
Analyzed logging relating to drilling data and evaluated open/cased-hole logs while stewarding log data acquisition and processing as well as monitored the team throughout log operations. Initiated elemental capture spectroscopy and NMR processing/interpretation.

Company: Ariab Mining Company Duration: Feb 01, 1997 to Jul 01, 2007 . 10 years 5 months Description:
provided geological input to short and long-term production plans. Established a database to track daily extracted ore quantities. Administered grade control and ore sampling process. Studied and examined the extracted minerals to assess their quality and grade.
Position: Geologist Duration: Feb 01, 1997 to Jul 01, 2007 . 10 years 5 months Description:
provided geological input to short and long-term production plans. Established a database to track daily extracted ore quantities. Administered grade control and ore sampling process. Studied and examined the extracted minerals to assess their quality and grade.
Education
University: The University of Manchester Degree: MSc Graduation Year: 2006 Area: Petroleum Geoscience Start - End Year: 2005 - 2006
University: The University of Khartoum Degree: BSc Graduation Year: 1996 Area: Geology Start - End Year: 1992 - 1996
Awards & Recognitions
Award Name: Chevening Scholarship Award Year: 2005 Award URL: https://www.chevening.org/
Description:
UK Government scholarships and fellowships that enable future leaders to study in the UK, whilst joining a global community of professionals who are creating positive change around the world.
Skills

Project management; 

Formation Evaluation; 

Production Optimization; 

Core-log integration; 

Portfolio Management; 

Optimization; 

Petrography; 

Carbonates; 

Rock Physics; 

Sonic; 

Log Analysis; 

Log Analysis (Wireline); 

Multimineral Analysis; 

Electrofacies Analysis; 

Research & Development; 

Pricing; 

Geomechanics; 

Data quality control; 

Techlog; 

English; 

clastics; 

Work History & Review

No Work History & Review yet!