• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


Sayantan Sanyal
Website
  

Sayantan Sanyal

!

About Sayantan Sanyal

Senior Petroleum Engineer
18 years of Production Technology experience, comprising of Prod. Optimization-Nodal analysis and Field Implementation, Prod. Enhancement (Carbonates-Acid Stimulation, Fracs), Artificial lift (ESP, Gas Lift), Well Completion design, Resource Planning and Execution, Well Surveillance management, Well Intervention design and implementation, Prod. Water management, Prod. Forecasting, Production Logging, and Well Integrity primarily related to Cement Integrity & Corrosion Log evaluation. Worked on remote Onshore and Offshore locations in Bangladesh, India, Angola, Gabon, and Kuwait for organizations such as Halliburton Energy Services, British-Gas and Kuwait Gulf Oil Company. Extensive business writing experience-compiled and implemented several best practices and Guidelines for internal implementation within the organization. Conducted multiple Data analysis projects to evaluate & interpret outcomes from Well Surveillance Frequent engagement with Database teams for customizing organizational Dashboards (Power-BI) Comprehensive experience of leading/ facilitating Steering committees and study teams



Experience
Company: Kuwait Gulf Oil Company Duration: Nov 01, 2011 to Present . 12 years 5 months
Position: Snr. Petroleum Engineer Duration: Nov 01, 2011 to Present . 12 years 5 months Description:
In my current role as a Senior Petroleum engineer, I am responsible for Production Optimization, Production Forecast, Sub-surface Asset management, and Well-Integrity for a mature Carbonate reservoir located in the Partitioned zone between Kuwait and Saudi Arabia, jointly managed by KGOC (Kuwait) and Chevron (Saudi Arabia)

Company: Halliburton Energy Services Duration: Jun 01, 2007 to Feb 01, 2011 . 3 years 8 months
Position: Field Engineer, Cased-Hole Duration: Jun 01, 2007 to Feb 01, 2011 . 3 years 8 months Description:
Worked in the West Africa region-Angola (Chevron's Offshore Assets in Malongo) and in Gabon (Total's Assets) • Reviewed Client’s requirements/Job Plan for production logging jobs, finalized Job design • Conducted production logging-Memory and Surface Read-out, Pulsed neutron surveys, through tubing perforation, pipe recovery jobs. • On-site Production log Interpretation for the Client for subsequent intervention-decisions • Assisted the Performance development coordinator in training & development of Angolan national graduate trainee engineers/tool operators.

Company: British Gas E&P India Ltd. Duration: Nov 01, 2005 to May 01, 2007 . 1 year 6 months
Position: Production Engineer/ Well-Integrity Engineer Duration: Nov 01, 2005 to May 01, 2007 . 1 year 6 months Description:
Worked in the Mumbai offshore region-Panna Mukhta and Tapti fields as part of Asset Management team • Well-Review (horizontal Multi-lateral Horizontal cased-hole carbonate completions on artificial lift) for well intervention jobs on Offshore-platform Gas-lift wells o Drafted & designed the Well Integrity management system o Planned & implemented interventions for Well Integrity restoration

Company: HLS Asia Ltd. ( Joint venture -Halliburton) Duration: Aug 01, 2003 to Nov 01, 2005 . 2 years 3 months
Position: Field Engineer,Wireline Logging Duration: Aug 01, 2003 to Nov 01, 2005 . 2 years 3 months Description:
Worked in India & Bangladesh as a Wireline Logging engineer-Both Open hole & Cased hole Engineer in charge for Bangladesh operations in 2004.
Education
University: Heriot-Watt Institute of Petroleum Engineering, Edinburgh, UK. Degree: Master of Science Graduation Year: 2018 Area: Petroleum Engineering Start - End Year: 2016 - 2018 Notes:
Master of Science in Petroleum Engineering Class of 2018, Distance learning. Research Project: Economic Appraisal of an Undeveloped Reservoir

University: Indian Institute of Technology (ISM), Dhanbad, India. Degree: Bachelor of Technology Graduation Year: 2003 Area: Petroleum Engineering Start - End Year: 1999 - 2003 Notes:
Bachelor of Technology in Petroleum Engineering, 1st Division Class of 2003 Final Year Project: Gas Hydrates
Skills

Well Data Management; 

Wireline Operations; 

Production Optimization; 

Offshore; 

Well Intervention operations; 

English; 

Petroleum analysis; 

Artificial Lift Optimization -ESP & Gas Lift; 

Well Integrity; 

Water Management; 

Business Writing; 

Production Enhancement; 

Work History & Review

No Work History & Review yet!