• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


loader
user profile pic
6 friends    3 followers

Peters Thompson

verified tick

!

About Peters Thompson

Nagpur, Maharashtra, India 10:39 pm local time

Engineering Specialist $150/hr
Visit My Services
Total Service posted: 1
[ 0.0 out of 5 (0 ratings) ]
Visit My Items
Total Items posted: 1
[ 0.0 out of 5 (0 ratings) ]
Book Consultation
Total Consultations posted: 1
[ 0.0 out of 5 (0 ratings) ]
My Post: 2

Engineering specialist versed in all aspects of upstream oil & gas production and transportation. Expertise in reservoir characterization, production maximization, and reservoir dynamics.

Asset development. Field development planning. Field optimization.




Experience
Company: work logo Lamar Prospect Duration: Jan 01, 2018 to Mar 10, 2021 . 3 years 2 months Description:

Evaluated a 4,000 acre HBP acreage position in Lamar & Marion counties producing from the Selma chalk (gas) and lower Tuscaloosa (oil) formations.

Development plans included a CO2 EOR flood targeting the lower Tuscaloosa sands, refracs of existing Selma chalk horizontal wells, and waterflood of Tuscaloosa sands.

Position: Asset Valuations Duration: Jan 01, 2018 to Jan 01, 2021 . 3 years Description:
Evaluated a 4,000 acre HBP acreage position in Lamar & Marion counties producing from the Selma chalk (gas) and lower Tuscaloosa (oil) formations. Development plans included a CO2 EOR flood targeting the lower Tuscaloosa sands, refracs of existing Selma chalk horizontal wells, and waterflood of Tuscaloosa sands.

Company: work logo Ector Prospect Characterization Duration: Jan 10, 2014 to Jan 10, 2018 . 4 years Description:

Evaluated a large contiquous, HBP acreage position in Ector county, permian basin targeting the Grayburg formation. Computed reserves to be 7 million BO & 9.9 Bcf gas. Strategy involved a mix of existing well re-entries and new drills. Identified 32 new drilling locations.

Acreage acquisition and development cost (dollar input) was $4 million. Asset value post development was anticipated at $66 million (dollar output). A multiples-on-invested-capital (MOIC) of ~16x.

Position: Reservoir Management Duration: Jan 01, 2014 to Jan 01, 2018 . 4 years Description:
Evaluated a large contiquous, HBP acreage position in Ector county, permian basin targeting the Grayburg formation. Computed reserves to be 7 million BO & 9.9 Bcf gas. Strategy involved a mix of existing well re-entries and new drills. Identified 32 new drilling locations. Acreage acquisition and development cost (dollar input) was $4 million. Asset value post development was anticipated at $66 million (dollar output). A multiples-on-invested-capital (MOIC) of ~16x.

Company: work logo Homona Development Project Duration: Jan 01, 2012 to Jan 10, 2014 . 2 years Description:

Was instrumental in the development of the Homona prospect, supplying reservoir characterization and asset development expertise.

Helped in characterization of the reservoir through various reservoir characterization techniques such as RCA, SCAL, SEM, Rock Eval, etc. Various Rock Mechanics tests, triaxial, brinell hardness, etc; various Reservoir Geochemistry tests, various reservoir maturation tests. Identified reservoir sweet spots & well landing positions.

Position: Reservoir Characterization & Description Duration: Jan 01, 2012 to Jan 01, 2014 . 2 years Description:
Was instrumental in the development of the Homona prospect, supplying reservoir characterization and asset development expertise. Helped in characterization of the reservoir through various reservoir characterization techniques such as RCA, SCAL, SEM, Rock Eval, etc. Various Rock Mechanics tests, triaxial, brinell hardness, etc; various Reservoir Geochemistry tests, various reservoir maturation tests. Identified reservoir sweet spots & well landing positions.
Skills

Formation Evaluation; 

Production Optimization; 

Core-log integration; 

Training Courses; 

Core description; 

reservoir architecture; 

Routine core analysis; 

Reservoir Engineer; 

Petroleum Engineer; 

Reservoir Characterization; 

Enhanced Oil Recovery (EOR); 

Work History & Review

No Work History & Review yet!