TAGOUGUI Hichem
!
About TAGOUGUI Hichem
Geologist
I’m a Geologist with almost 10 years of experience in oil & gas industry. I’m familiar with Exploration & Development tasks like preparation of geological programs, tender documents, technical & commercial evaluation of the different bids, and the supervision of Mud Logging, Open & Cased Hole Wireline, and MWD/LWD. Key member in multidisciplinary team performing the evaluation and finalizing exploration & development studies. Experienced Operation and Wellsite geologist with more than 20 wells in my career subdivided between development, exploration, vertical and horizonal wells.
Experience
Company: Anglo-Tunisian Oil and Gas Duration: Nov 11, 2019 to Present . 5 years Description:• Revision of all geological data of “Bir Ben Tartar field” (Ordovician tight sandstone reservoir) using updated petrophysical analysis and seismic interpretation: Detailed mapping and correlation of stratigraphic sequences to predict the lateral distribution of a complex heterogenous reservoir.
• Involved in the preparation of an updated geological model for the field.
• Propose the best candidates for infill-drilling program locations based the updated depositional model.
• Working with multi-disciplinary team to revise the potential of the existing wells and propose the candidates for workovers and Sidetrack operations.
• Hydraulic fracturing results review. Involved with Contractor in preparation of re-frac program using new technologies. Selection of best candidate to be re-fraced
• Preparation of bid documents (Mud Logging & Open/Cased hole logging), and geological programs for development and exploration drilling programs.
• Update of the resources calculation and prospect maturation in the exploration permits. Preparation of the operational tasks (Prognosis, pore pressure prediction, mud logging and wireline programs.
• Follow-up of the exploration and development activities performed by the partners (G&G studies and drilling programs).
• Preparing & presenting the geological section in the official documents for the technical meeting with partners and authority (National Oil Company).
Position: Geologist
Duration: Nov 01, 2019 to Present . 5 years
Description:
• Revision of all geological data of “Bir Ben Tartar field” (Ordovician tight sandstone reservoir) using updated petrophysical analysis and seismic interpretation: Detailed mapping and correlation of stratigraphic sequences to predict the lateral distribution of a complex heterogenous reservoir.
• Involved in the preparation of an updated geological model for the field.
• Propose the best candidates for infill-drilling program locations based the updated depositional model.
• Working with multi-disciplinary team to revise the potential of the existing wells and propose the candidates for workovers and Sidetrack operations.
• Hydraulic fracturing results review. Involved with Contractor in preparation of re-frac program using new technologies. Selection of best candidate to be re-fraced
• Preparation of bid documents (Mud Logging & Open/Cased hole logging), and geological programs for development and exploration drilling programs.
• Update of the resources calculation and prospect maturation in the exploration permits. Preparation of the operational tasks (Prognosis, pore pressure prediction, mud logging and wireline programs.
• Follow-up of the exploration and development activities performed by the partners (G&G studies and drilling programs).
• Preparing & presenting the geological section in the official documents for the technical meeting with partners and authority (National Oil Company).
Company: MedcoEnargi Oil & Gas Duration: Aug 01, 2014 to Oct 01, 2019 . 5 years 2 months Description:
• Working with multi-disciplinary team (Tunis & Jakarta) for Exploration activities: Basin studies, petrophysical analysis, post-drill analysis, prospects identification and maturation, prospects ranking & risk assessment, reserves in place estimation, and well planning.
• Preparation of the needed documents for drilling activities: Geological programs (Prognosis, Pore pressure prediction, Mud logging and Wireline programs) and the Mud Logging and Wireline tender documents.
• Revision of the potential in BEK permit & Adam Concession operated by ENI: Volumetric calculation of the Oil and Gas/Condensate reserves in the identified prospects using probabilistic method.
• I supervised the wireline jobs needed during the workovers (perforation, re-perforation, Scal / corrosion investigation..).
• I performed the evaluation of the Mud logging and Open/Cased hole logging tenders for a drilling program of eight (8) 1500m development wells (Preparation of the scoop of work, technical & commercial evaluation of the received bids).
• I worked with the G&G team in the preparation of the Geological Model of Bir Ben Tartar oil filed (Southern Tunisia- Ghadames Basin).
Position: Geologist
Duration: Aug 01, 2014 to Oct 01, 2019 . 5 years 2 months
Description:
• Working with multi-disciplinary team (Tunis & Jakarta) for Exploration activities: Basin studies, petrophysical analysis, post-drill analysis, prospects identification and maturation, prospects ranking & risk assessment, reserves in place estimation, and well planning.
• Preparation of the needed documents for drilling activities: Geological programs (Prognosis, Pore pressure prediction, Mud logging and Wireline programs) and the Mud Logging and Wireline tender documents.
• Revision of the potential in BEK permit & Adam Concession operated by ENI: Volumetric calculation of the Oil and Gas/Condensate reserves in the identified prospects using probabilistic method.
• I supervised the wireline jobs needed during the workovers (perforation, re-perforation, Scal / corrosion investigation..).
• I performed the evaluation of the Mud logging and Open/Cased hole logging tenders for a drilling program of eight (8) 1500m development wells (Preparation of the scoop of work, technical & commercial evaluation of the received bids).
• I worked with the G&G team in the preparation of the Geological Model of Bir Ben Tartar oil filed (Southern Tunisia- Ghadames Basin).
Company: Storm Ventures International Inc. Duration: Oct 01, 2011 to Aug 01, 2014 . 2 years 10 months Description:
• I performed the evaluation of Mud logging and Wireline tender documents (Preparation of the scoop of work, technical & commercial evaluation of the received bids)
• I prepared the geological program for development and exploration wells including prognosis, well correlation, Mud logging, and wireline programs.
• I worked with as Wellsite Geologist (12/24) for the supervision of five (5) 1500m vertical wells and (5) 2700m horizontal wells with 1000m horizontal legs, and two (2) 1500m exploration wells.
• I worked as Senior Wellsite geologist (24/24h) for the supervision of seven (7) 1500m vertical development wells, and one (1) 1500 side-tracked development well.
• I supervised Mud logging, MWD/LWD acquisition, and Open hole/Cased hole wireline jobs.
• I supervised (2) coring operations with a 60m of cored interval in each job (Ordovician reservoir).
• I assisted and supervised 13 MDT jobs including pressure testing and sampling.
• I supervised 3 FMI jobs, 2 Sidewall coring jobs, and 3 VSP jobs.
• I prepared the final geological reports and masterlogs of eight (8) 1500m development wells
Position: Operation Geologist
Duration: Oct 01, 2011 to Aug 01, 2014 . 2 years 10 months
Description:
• I performed the evaluation of Mud logging and Wireline tender documents (Preparation of the scoop of work, technical & commercial evaluation of the received bids)
• I prepared the geological program for development and exploration wells including prognosis, well correlation, Mud logging, and wireline programs.
• I worked with as Wellsite Geologist (12/24) for the supervision of five (5) 1500m vertical wells and (5) 2700m horizontal wells with 1000m horizontal legs, and two (2) 1500m exploration wells.
• I worked as Senior Wellsite geologist (24/24h) for the supervision of seven (7) 1500m vertical development wells, and one (1) 1500 side-tracked development well.
• I supervised Mud logging, MWD/LWD acquisition, and Open hole/Cased hole wireline jobs.
• I supervised (2) coring operations with a 60m of cored interval in each job (Ordovician reservoir).
• I assisted and supervised 13 MDT jobs including pressure testing and sampling.
• I supervised 3 FMI jobs, 2 Sidewall coring jobs, and 3 VSP jobs.
• I prepared the final geological reports and masterlogs of eight (8) 1500m development wells
Education
University: University of Sciences Tunis - El Manar 2 Degree: Master Graduation Year: 2010 Area: Geology Start - End Year: 2008 - 2010Skills
Formation Evaluation;
Wireline Operations;
Measurement While Drilling;
Formation correlation;
Core-log integration;
Planning, implementation and QC of data accquisition programs for Oil/Gas operators;
Operation geology;
HSSE;
Sequence Stratigraphy;
Petrography;
Sonic;
Log Analysis;
Log Analysis (Wireline);
Log Analysis (MWD);
Techlog;
Interactive Petrophysics;
English;
clastics;
Sedimentology;
Core description;
reservoir architecture;
Petroleum analysis;
Well Integrity;
Reservoir Characterization;
Horizontal Drilling;
Arabic;
Gravitas, Wellview, Wellcad, Geolog, Rigsteer;
Work History & Review