• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


loader

Acid / Chemical Treatment Products

02 July 2024
Share
!
Cost: $10,000.00 - $250,000.00
Description of Service

DiverterPlus products are temporary diverting materials used to improve the distribution of treating fluids across multiple perforations or openhole intervals. During placement, Div+ and RapidVert+ are solid non-toxic particles capable of blocking perforation tunnels, formation faces, and fractures near the wellbore. After a pre-determined length of time, the diverter will hydrolyze into a clear, non-hazardous liquid. This process is driven simply by time and bottom-hole temperature, meaning that no additional remedial work is required. DiverterPlus blends are optimized for transport and plugging performance in the low rate/high leakoff environment of acid/chemical treatments.

What You Will Get From Purchasing This Professional Service. Deliverables

Key Design Factors

  • Maximize matrix conductivity
  • Particles designed for optimized transport in low rate/low viscosity applications
  • Reduced time/expense

Benefits and Outcomes

  • Ensure acid/chemicals are distributed evenly across entire stimulated interval
  • Increased duration between treatments
  • Predictable time to production

The low rate designs that are often associated with acid and chemical treatments can make it difficult to determine the effectiveness of diversion by traditional pressure response analysis alone. As such, DiverterPlus encourages our customers to also determine success based upon long term production analysis. Treatment effectiveness can be determined by analysis of the rate and magnitude of production decline. The Chart above illustrates the shallow decline rate when using optimized diversion materials such as Div+ and RapidVert+ versus using traditional diverters. The reduced decline frequently means periodic treatments are needed less often, substantially reducing operating costs.

Duration To Complete Service. How Long Before Service Is Completed

1-3 months

In his role as a Technical Solutions Specialist, Sam employs his extensive experience in the drilling and cementing segments to spearhead DiverterPlus’ efforts in those markets. Sam assists in new product development and brings unique technologies and capabilities to help drive DiverterPlus’ service-oriented customer philosophy.

Sam Shwayat graduated from Oklahoma State University in Stillwater Oklahoma with a BS in Electrical Engineering. Upon Graduation, Sam began his Oilfield Services career with Schlumberger as a cementing field engineer followed by 11+ years of different positions within the Schlumberger cementing service line including field service management, project coordination, technical sales, and supply chain management. Sam time with Schlumberger took him around the world to a variety of locations including Oklahoma, NW Texas, Saudi Arabia, and Midland before finally settling in the Houston area while with Schlumberger. Sam then Joined a nitrogen equipment manufacturer serving the oil and gas industry with onsite N2 generators as a technical sales engineer.

Ratings & Reviews

No Ratings & Reviews given yet..

More Professional Services From Samer Shwayat

service image

Offshore Solvent/Scale Treatment Services

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Conformance Improvement Services

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Drillouts / Cleanouts Services

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Acid / Chemical Treatment Products

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Refracturing Services

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Near Wellbore Diversion(NWB) Services

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Drilling LCM

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

service image

Far Field Diversion (FF) Services

0.0 out of 5 (0)
service user image

Samer Shwayat

10,000.00 - $250,000.00

Similar Services (Recommended services)

service image
Surface Well Testing Services
0.0 out of 5 (0)
service user image

Pico Energy

10,000.00 - $500,000.00

service image
Cloud and Data Solutions
0.0 out of 5 (0)
service user image

Wipro

50,000.00 - $5,000,000.00

service image
Dating by various methods
0.0 out of 5 (0)
service user image

GPG SERVICES S.A.

5,000.00 - $250,000.00

service image
QHSE Management System Audits
0.0 out of 5 (0)
service user image

Hub Renewables

50,000.00 - $50,000.00

service image
Will Provide EOR Assessments & Evaluations For Your Project.
0.0 out of 5 (0)
service user image

Tom Smith

4,000.00

service image
Depth Prognosis
0.0 out of 5 (0)
service user image

Applied Geoscience

5,000.00 - $250,000.00

service image
Diverter Spools Services
0.0 out of 5 (0)
service user image

K&B Industries

1,000.00 - $30,000.00

service image
GEOPHYSICAL SOLUTIONS - Portable Borehole Logger - 1 SERIES (150M / 250M CABLE)
0.0 out of 5 (0)
service user image

Pan India Consultants Pvt. Ltd.

10,000.00 - $100,000.00

service image
Radial Drilling
0.0 out of 5 (0)
service user image

Pico Energy

10,000.00 - $250,000.00