• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


loader

Acid / Chemical Treatment Products

02 July 2024
Share
!
Cost: $10,000.00 - $250,000.00
Description of Service

DiverterPlus products are temporary diverting materials used to improve the distribution of treating fluids across multiple perforations or openhole intervals. During placement, Div+ and RapidVert+ are solid non-toxic particles capable of blocking perforation tunnels, formation faces, and fractures near the wellbore. After a pre-determined length of time, the diverter will hydrolyze into a clear, non-hazardous liquid. This process is driven simply by time and bottom-hole temperature, meaning that no additional remedial work is required. DiverterPlus blends are optimized for transport and plugging performance in the low rate/high leakoff environment of acid/chemical treatments.

What You Will Get From Purchasing This Professional Service. Deliverables

Key Design Factors

  • Maximize matrix conductivity
  • Particles designed for optimized transport in low rate/low viscosity applications
  • Reduced time/expense

Benefits and Outcomes

  • Ensure acid/chemicals are distributed evenly across entire stimulated interval
  • Increased duration between treatments
  • Predictable time to production

The low rate designs that are often associated with acid and chemical treatments can make it difficult to determine the effectiveness of diversion by traditional pressure response analysis alone. As such, DiverterPlus encourages our customers to also determine success based upon long term production analysis. Treatment effectiveness can be determined by analysis of the rate and magnitude of production decline. The Chart above illustrates the shallow decline rate when using optimized diversion materials such as Div+ and RapidVert+ versus using traditional diverters. The reduced decline frequently means periodic treatments are needed less often, substantially reducing operating costs.

Duration To Complete Service. How Long Before Service Is Completed

1 - 3 months

DiverterPlus LLC was born as a wholly owned subsidiary of Jamplast Inc. to hyper-focus on serving the degradable diversion technology needs of the oil and gas industry in their demanding downhole operations. DiverterPlus provides a wealth of options and resources to best assist and educate energy producers in the use of degradable diverting technologies and solutions.

Having pumped millions of pounds of diverter, DiverterPlus is the industry leader both in North America and the international market. We have the largest selection of degradable and permanent polymers on the market, and the greatest ability to create custom products for specific needs. Our expertise is expansive and consultations are always free. Let us help optimize your downhole projects.

Ratings & Reviews

No Ratings & Reviews given yet..

More Professional Services From DiverterPlus, LLC

Far Field Diversion (FF)

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Drilling LCM

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Near Wellbore Diversion(NWB)

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Refracturing

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Acid / Chemical Treatment Products

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Drillouts / Cleanouts Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Conformance Improvement Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Offshore Solvent/Scale Treatment Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Similar Services (Recommended services)

Drilling Fluid Design & Formulation
0.0 out of 5 (0)

Dr. Farad Sagala

5,000.00

Compressed Natural Gas Solutions
0.0 out of 5 (0)

THKN SERVICES SA DE CV

10,000.00 - $10,000,000.00

Safety Instrumented Systems
0.0 out of 5 (0)

XRS Consulting Engineers CC

10,000.00 - $5,000,000.00

Geoscience Services
0.0 out of 5 (0)

LITHoil

5,000.00 - $250,000.00

Scale Removal and Inhibition
0.0 out of 5 (0)

Pico Energy

10,000.00 - $500,000.00

Subsurface Analysis
0.0 out of 5 (0)

Wipro

10,000.00 - $10,000,000.00

Project Design
0.0 out of 5 (0)

PMG Group C.A.

5,000.00 - $1,000,000.00

Project Management Services - Ground Source Heat Pump
0.0 out of 5 (0)

SK Alldelite

5,000.00 - $100,000.00

Oil and Gas Opportunities in Italy - Exploration and Production Reports
0.0 out of 5 (0)

Strata GeoResearch

10,000.00 - $500,000.00