• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


loader

Drilling LCM

02 July 2024
Share
!
Cost: $10,000.00 - $250,000.00
Description of Service

DiverterPlus drillout products are temporary diverting materials used to improve circulation and drillout efficiency. During placement, DiverterPlus is a solid degradable polymer material capable of bridging across perforation tunnels near the wellbore. After successfully diverting fluid, the diverter is designed to hydrolyze to a clear, non-hazardous liquid. This process is driven simply by time, temperature, and pressure in the presence of water meaning that no additional remedial work is necessary.

What You Will Get From Purchasing This Professional Service. Deliverables

Key Design Factors

  • Regain circulation in severe loss conditions
  • Reduced risk of uncemented void spaces leads to better bonding
  • Various deployment plans allow for tailored squeeze solutions, continuous circulation, or freeing stuck tubulars

Benefits and Outcomes

  • Minimal formation damage due to degradability of product
  • Reduced Mud Losses
  • Improved Hole Quality
Duration To Complete Service. How Long Before Service Is Completed

1 - 3 months

DiverterPlus LLC was born as a wholly owned subsidiary of Jamplast Inc. to hyper-focus on serving the degradable diversion technology needs of the oil and gas industry in their demanding downhole operations. DiverterPlus provides a wealth of options and resources to best assist and educate energy producers in the use of degradable diverting technologies and solutions.

Having pumped millions of pounds of diverter, DiverterPlus is the industry leader both in North America and the international market. We have the largest selection of degradable and permanent polymers on the market, and the greatest ability to create custom products for specific needs. Our expertise is expansive and consultations are always free. Let us help optimize your downhole projects.

Ratings & Reviews

No Ratings & Reviews given yet..

More Professional Services From DiverterPlus, LLC

Far Field Diversion (FF)

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Drilling LCM

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Near Wellbore Diversion(NWB)

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Refracturing

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Acid / Chemical Treatment Products

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Drillouts / Cleanouts Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Conformance Improvement Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Offshore Solvent/Scale Treatment Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Similar Services (Recommended services)

Procurement Services
0.0 out of 5 (0)

National Engineering Services Pakistan (Pvt.) Limited (NESPAK)

1,000,000.00 - $100,000,000.00

Geotechnical Investigation Works
0.0 out of 5 (0)

Geo-Tech Consultancy Services (GCS)

100,000.00 - $5,000,000.00

Special Services with Machine Learning - Fluid sand classification
0.0 out of 5 (0)

Ameyem

5,000.00 - $250,000.00

Arkoma STACK Regional Study
0.0 out of 5 (0)

NUTECH

100,000.00 - $1,000,000.00

Ark-La-Tex Jurassic Study
0.0 out of 5 (0)

NUTECH

100,000.00 - $1,000,000.00

Interpretation and Processing Sonic
0.0 out of 5 (0)

MENCHIO PETROFISICA LTDA

5,000.00 - $25,000.00

Total Hydrocarbon Analyzers
0.0 out of 5 (0)

Electronic Construction Service - ECS

10,000.00 - $100,000.00

Off-Grid System Design 
0.0 out of 5 (0)

Agbawi Olatunji

2,000.00 - $100,000.00

Energy Modeling
0.0 out of 5 (0)

Agbawi Olatunji

2,000.00 - $100,000.00