• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


loader

Drillouts / Cleanouts Services

02 July 2024
Share
!
Cost: $10,000.00 - $250,000.00
Description of Service

DiverterPlus drillout products are temporary diverting materials used to improve circulation and drillout efficiency. During placement, DiverterPlus is a solid degradable polymer material capable of bridging across perforation tunnels near the wellbore. After successfully diverting fluid, the diverter is designed to hydrolyze to a clear, non-hazardous liquid. This process is driven simply by time, temperature, and pressure in the presence of water meaning that no additional remedial work is necessary.

What You Will Get From Purchasing This Professional Service. Deliverables

Key Design Advantages

  • Regain circulation in severe loss conditions
  • Low rate transport
  • Compatibility with BHA

Benefits and Outcomes

  • Reduced time/expense
  • Predictable time to production
Duration To Complete Service. How Long Before Service Is Completed

1-3 months

DiverterPlus LLC was born as a wholly owned subsidiary of Jamplast Inc. to hyper-focus on serving the degradable diversion technology needs of the oil and gas industry in their demanding downhole operations. DiverterPlus provides a wealth of options and resources to best assist and educate energy producers in the use of degradable diverting technologies and solutions.

Having pumped millions of pounds of diverter, DiverterPlus is the industry leader both in North America and the international market. We have the largest selection of degradable and permanent polymers on the market, and the greatest ability to create custom products for specific needs. Our expertise is expansive and consultations are always free. Let us help optimize your downhole projects.

Ratings & Reviews

No Ratings & Reviews given yet..

More Professional Services From DiverterPlus, LLC

Far Field Diversion (FF)

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Drilling LCM

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Near Wellbore Diversion(NWB)

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Refracturing

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Acid / Chemical Treatment Products

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Drillouts / Cleanouts Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Conformance Improvement Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Offshore Solvent/Scale Treatment Services

0.0 out of 5 (0)

DiverterPlus, LLC

10,000.00 - $250,000.00

Similar Services (Recommended services)

Bid coordination process
0.0 out of 5 (0)

Piasa Consultores

5,000.00 - $250,000.00

AVO and Rock Physics Analysis
0.0 out of 5 (0)

Ameyem

5,000.00 - $300,000.00

2D and 3D seismic interpretation
0.0 out of 5 (0)

GPG SERVICES S.A.

5,000.00 - $250,000.00

Cased Well Profiles
0.0 out of 5 (0)

MENCHIO PETROFISICA LTDA

5,000.00 - $45,000.00

Deterministic and Probabilistic Petrophysics Services
0.0 out of 5 (0)

BRUNO FARIA

10,000.00 - $75,000.00

Optimal Well Trajectory Recommendation
0.0 out of 5 (0)

Geo3Conseil

5,000.00 - $50,000.00

Manufacturer & Supplier of Electrical Control Panels and Electrical Turnkey Contractor.
0.0 out of 5 (0)

A.B. Electrical Works

5,000.00 - $250,000.00

A-la-carte Geomechanical Project Analysis
0.0 out of 5 (0)

Geo3Conseil

5,000.00 - $50,000.00

We Will Provide Certified Advanced Gas Detection
0.0 out of 5 (0)

Tom Selman

5,000.00 - $50,000.00