• Register
  • Login
  • EnglishFrenchGermanItalianPortugueseRussianSpanish
Registration is Free


loader

Drilling Fluid Design & Formulation

20 February 2024
Description of Service

Drilling fluid, commonly known as drilling mud, is an essential component used in the exploration and production of oil and gas. It helps to maintain wellbore stability by preventing the walls of the borehole from collapsing inwards.

In this service buyer will obtain compositional and formulation design of their drilling muds.

 

What You Will Get From Purchasing This Professional Service. Deliverables

In this service buyer will obtain compositional and formulation design of their drilling muds based on their reservoir properties and geological characteristics.

Duration To Complete Service. How Long Before Service Is Completed

1 month

Please click name.

Ratings & Reviews

No Ratings & Reviews given yet..

More Professional Services From Dr. Farad Sagala

Enhanced Oil Recovery Expert and Any Services Related To Well Stimulation and Fracturing

0.0 out of 5 (0)

Dr. Farad Sagala

10,000.00

Characterization of Crude Oil

0.0 out of 5 (0)

Dr. Farad Sagala

6,000.00

Drilling Fluid Design & Formulation

0.0 out of 5 (0)

Dr. Farad Sagala

5,000.00

Hydraulic Fracturing Services

0.0 out of 5 (0)

Dr. Farad Sagala

4,500.00

Well Stimulation Services

0.0 out of 5 (0)

Dr. Farad Sagala

4,500.00

Lost Circulation Services

0.0 out of 5 (0)

Dr. Farad Sagala

4,000.00

Similar Services (Recommended services)

2D/3D Seismic Exploration
0.0 out of 5 (0)

Southwest Pinnacle Exploration Limited

10,000.00 - $10,000,000.00

Hydraulic Lift Jet Pump Services
0.0 out of 5 (0)

JW OILFIELD EQUIPMENT & PUMP LLC

10,000.00 - $500,000.00

GEOINFORMATICS SOLUTIONS - Photogrammetry
0.0 out of 5 (0)

Pan India Consultants Pvt. Ltd.

10,000.00 - $1,000,000.00

Pile Load Test
0.0 out of 5 (0)

Geo-Tech Consultancy Services (GCS)

10,000.00 - $500,000.00

Feasibility Studies
0.0 out of 5 (0)

Abraham Global Petrochemical & Gas Co. (AGPGC)

10,000.00 - $10,000,000.00

Fracture Injection Test Analysis
0.0 out of 5 (0)

NUTECH

5,000.00 - $30,000.00

Diverter Spools Services
0.0 out of 5 (0)

K&'B Industries

10,000.00 - $50,000.00

Technical Support Services
0.0 out of 5 (0)

XRS Consulting Engineers CC

10,000.00 - $500,000.00

Existing Field Studies
0.0 out of 5 (0)

GEO LINE SOLUTION

10,000.00 - $500,000.00